So, I've gotten a whole lot done - but nothing much exciting.
Lots of cleaning, removed every bit of trim, all the paint, and have the undercarriage almost completely cleaned up. I've also done a bunch of body work. Aligning doors, trying to align the hood (that's gonna take some more work). Fixing the large dents, and applying way too much body filler for a beater rig. Welded up a bunch of holes in the body, fixed the front fenders and welded them into the front clip.
No pictures of that stuff yet though, I'm going to wait until I get it ready for paint. I talked my brother out of the bed for his willy's truck, and if everything goes well it will at the very least be sitting on the frame tomorrow.
Junkyard trip to Spokane was successful. Met up with an owner of a 66 Thriftside Gladiator and got a bunch of measurements for the frame skirts I will need to fabricate.
Also picked up the big remaining pieces I need for my upgraded brakes.
What I'm hoping my truck will start to look like:
My collection of emblems is growing. Only have a few more to find, then it'll be time to clean them up, repair the broken ones, and then re-paint.
14 Bolt disc brake conversion brackets:
Everything I need to get the new rear axle bolted up:
My Junkyard goodies. Hydro brake booster from a 2005 Chevy Suburban. Really common chevy part, runs from 02-10, and is in the suburban, sierra, avalanche, escalade, Yukon, and a few others.
I'll need to remove the snap ring, nut, and the original mounting plate:
Which will be replaced by a simple piece of plate:
Which will then bolt to a mount I need to weld up in place of the original master cylinder.
The hydro boost unit linkage should be the exact length I need, but that's easily adjusted by shortening the piece of tube. Bolt hole on the end of the linkage is the correct size to bolt right up to my existing manual brake pedal.
So yeah, lots of parts not yet on the jeep. I've been spending way too much time working on the body, and not enough on everything else that needs to be done. Still hope to get this thing done this summer though.